Our Team
Our Team
How competence is defined, assessed, authorized and re-verified for the work described on this site.
Disciplines Covered
Work is scoped across dimensional metrology disciplines: coordinate measuring machine performance verification and repair, portable arm testing where applicable, part programming, and gage calibration spanning length, form and thread standards.

Competence Framework
Competence for each discipline is defined against the standard governing that test: ISO 10360-2 and ASME B89.4.1 for bridge and gantry machines, ISO 10360-12 for articulated arms where applicable to the configuration, and ISO 10360-5 for probing error. Requests are reviewed against the performing laboratory's documented scope before acceptance, with method selection checked against the customer's purchase-order requirement at each stage. Re-verification of competence follows the performing laboratory's own accreditation cycle.
In practice our framework runs in four steps, and it runs the same way for every discipline listed above.
How Competence Is Established
- 01
Defined
Each task has a written competence requirement: the method, the equipment, the range, and the evidence that counts as proof of capability.
- 02
Assessed
Capability is demonstrated against that requirement — supervised work, witnessed measurement, and comparison against a known reference.
- 03
Authorised
Authorization is granted per task and per range, never as a blanket qualification, and it is recorded.
- 04
Re-verified
Authorizations are reviewed on a schedule and after any change of method, equipment or standard. Training records are kept for as long as the authorization is live.
Authorization and Review
Results are reviewed before release by laboratory staff authorized under the performing laboratory's own quality system, identified on the certificate by role. Reported uncertainty, the decision rule, and the traceability statement are each checked present before a certificate is issued. Complaints and appeals follow a documented procedure, with as-found data retained regardless of the outcome.
Results are reviewed before release. The review confirms that the method used matches the method quoted, that the recorded conditions are within the limits the method requires, that the calculation and the stated uncertainty are correct, and that the certificate says what the measurement supports and nothing more. Only personnel authorized for that task and range may approve the release of a result, and the approver is recorded against the certificate.
Capacity and Continuity
Scheduling is built around on-site visit windows and ship-in turnaround confirmed per request; no fixed capacity figure is published here because it varies by frame type, travel distance and current backlog. Continuity for multi-machine or multi-site accounts is handled through a single scheduling point so recall dates for CMMs and gages stay aligned. Escalation for an out-of-tolerance finding follows the notification and impact-assessment path described on the quality-system page.
We staff for cover rather than for peaks. More than one person is authorized for every routine task, so absence or a spike in demand moves the schedule and leaves the result alone.
Requirements outside current authorizations are escalated, never attempted. They are quoted through a laboratory whose scope covers the measurement, or declined with the reason stated.
Related Reading
Equipment, traceability and the management system these authorizations sit inside are described on the quality system page. Open technical roles are listed on the careers page.
Auditing a supplier?
Competence records, method statements and scope detail are supplied on request with any quotation.